Thermmark Play Logo

FAQs

We understand that purchasing playground markings is a serious investment that requires careful planning and financial assurance.

Below, we have compiled our most frequently asked questions, designed to provide the clear, expert guidance you need. We cover critical areas like Sport Premium compliance, long-term durability, and the full capability of our bespoke design studio, ensuring you make the best, most compliant decision for your budget.

What, How, and Materials

What are playground markings made of?Our markings are made of preformed thermoplastic. This is a durable, non-toxic, road-grade material that is significantly more resilient and longer-lasting than traditional outdoor paint.

Why choose thermoplastic over paint?Thermoplastic is up to 10 times more durable than paint, offering an anti-slip, vibrant finish that is designed to last 5-10 years. Paint fades quickly and requires repeated, costly reapplication.

How are thermoplastic playground markings applied?Thermoplastic markings are applied using heat, typically a gas torch, melting the material until it becomes slightly liquid and solidifes again, bonding to the ground. 

Can markings be installed on different surfaces (concrete, block paving, etc.)?While we don't always advise installing on block paving, we are able to install. We are experts in surface preparation and use specialist primers and techniques to ensure a strong bond on various surfaces, including tarmac, concrete, and some specialised block paving.

Durability, Safety, and Immediate Use

How long do Thermmark markings last?Our markings are designed to last 5 to 10 years, depending on usage and surface type. This lifespan is typically up to 10 times longer than standard outdoor paint, offering a superior long-term return on investment.

Are your playground markings safe and non-slip?Absolutely. Our materials are non-toxic, environmentally safe, and contain anti-slip properties in the surface layer. This ensures they meet all UK safety standards and remain safe even when wet.

How soon can pupils use the playground after installation?Almost immediately. The thermoplastic cools and hardens very quickly after application. Once the installation team has finished clearing the area, the playground is ready for immediate use.

Logistics, Weather, and Guarantees

Do you offer a guarantee on your markings?Yes. We offer a comprehensive 3-Year Manufacturer Guarantee on all manufacturing defects. This is a core benefit of choosing a manufacturer, ensuring your investment is protected.

How long does a typical installation take?Most standard playground installations are completed within 1 to 2 days. We schedule work to ensure rapid turnaround and minimal disruption to the school schedule.

Can markings be applied in winter or wet weather?Thermoplastic requires the surface to be clean and dry. We can install on clear, dry days, even if it is cold. However, we cannot install in persistent rain, snow, or if the surface temperature is below a safe bonding threshold. We monitor weather closely to ensure a successful application.

Can markings be applied to a newly laid tarmac surface?We advise waiting at least 28 days after a new asphalt surface is laid. This allows the tarmac to fully cure and release volatile oils that could compromise the bond of the thermoplastic. We can advise on your specific site’s timeline - just contact us!

Do you install nationwide?Yes. We operate and install across the entire UK mainland, and can work with you if you require installation outside of the mainland.

Funding and Compliance

Can schools get funding for playground markings?Yes, but compliance is essential. The PE & Sport Premium Fund can be used for "revenue maintenance costs" - meaning funds can be used for replacing or repainting existing lines and markings to maintain the asset.

Why are Thermmark markings the best value for public funds?Our model eliminates middleman markups, ensuring better value. Furthermore, our superior durability means less re-marking and maintenance costs, providing the best long-term value for public funds.

If we have no existing markings, can we still use the Sport Premium?Installing markings where none existed is typically classified as Capital Expenditure (creating a new asset) and is generally prohibited under the standard Sport Premium rules. This must usually be funded through grants or fundraising.

mirror me, copy me playground marking in thermoplastic

Design, Customisation, and Scale

Can we have a completely custom design or school logo?Yes. As the manufacturer, our Bespoke Design Studio can precision-cut any design, logo, or complex artwork you can imagine. We can perfectly match your official school branding or architect’s vision.

Do you handle large-scale public art projects?Yes! Our largest projects include complex public commissions like the Sir Mark Cavendish Raceway Mural. We are the trusted manufacturing partner for councils, architects, and developers on complex, large-scale projects.

What is 'overmarking' and can you do it?Yes. Overmarking is the practical solution of designing a new, slightly larger thermoplastic marking to completely cover or replace an old, faded marking in a single step, giving the area a fresh start.

Service and Safety Assurance

How are old or damaged markings removed?We offer a specialised Playground Refresh Service. We use professional removal methods to safely and completely lift old, faded thermoplastic or paint, preparing the surface for a fresh installation.

Are your installation teams DBS checked?Yes. All members of our in-house installation teams are fully vetted, qualified, and DBS checked, ensuring we meet all safeguarding requirements while working on school sites.

What kind of site preparation is needed from the client?Minimal. We simply ask that the installation area be cleared of equipment and excessive dirt/moss be cleaned off, as this will stop the markings from adhering to the surface. Our team handles the rest, including sweeping and preparing the surface to ensure optimal bonding.

What is the average lead time?Lead times vary seasonally, but we typically aim to schedule installation within 4 to 8 weeks of the quote being accepted and the design being finalised. We work closely with you to find a convenient date.

What happens if my new markings lift prematurely?Simply call us. Our 3-Year Manufacturer Guarantee covers lifting due to material failure. We will schedule a repair or replacement as part of our commitment to quality.

Do you offer any designs that assist with specific educational outcomes?Yes. We have a vast range of markings designed to support numeracy, literacy, and physical skills development, such as Fitness Trails, Phonics Markings, and our complex art installations.

Diamond Top Side View Stable Mat

Our Guide to Playground Markings

Not sure what you're looking for? See our blog for some inspiration!

Ibstock Junior School Case Study

See how we helped Ibstock transform their space with a bespoke trail - designed by the children!

Anti-Slip

Anti-slip thermoplastic markings enhance playground safety by reducing the risk of slips and falls, even in wet conditions.

Long-lasting

They are durable, weather-resistant, and retain vibrant colours for years, ensuring long-lasting fun.

Low Maintenance

Require minimal maintenance, making them a cost-effective choice for schools and parks.

Customisable

With a wide range of colours, shapes, and designs, you can create custom designs for your playground's needs.

Based on the Curriculum

From number grids and phonics games to world maps and clock faces, our markings help reinforce key concepts.

Encourage Active Play

By integrating movement with education, they encourage engagement, retention, and a love for learning outside the classroom.

fun playground markings

Need Help Designing Your New Playground? Speak to an Expert!

Let’s bring your playground vision to life! Tell us a bit about your project, and our friendly team will be in touch to help you create a fun, safe, and inspiring play space.


Thermmark award winning playgrounds
Grassmats Ltd logo

Thermmark Ltd
Second Avenue
Radnor Park Industrial Estate
Congleton
CW12 4XJ

OPENING HOURS

Monday 8AM - 5PM
Tuesday 8AM - 5PM
Wednesday 8AM - 5PM
Thursday 8AM - 5PM
Friday 8AM - 4PM
Saturday Closed
Sunday Closed

Thermmark Limited

Registered in England & Wales No.

Vat No.