We understand that purchasing playground markings is a serious investment that requires careful planning and financial assurance.
Below, we have compiled our most frequently asked questions, designed to provide the clear, expert guidance you need. We cover critical areas like Sport Premium compliance, long-term durability, and the full capability of our bespoke design studio, ensuring you make the best, most compliant decision for your budget.
Our markings are made of preformed thermoplastic. This is a durable, non-toxic, road-grade material that is significantly more resilient and longer-lasting than traditional outdoor paint.
Thermoplastic is up to 10 times more durable than paint, offering an anti-slip, vibrant finish that is designed to last 5-10 years. Paint fades quickly and requires repeated, costly reapplication.
Thermoplastic markings are applied using heat, typically a gas torch, melting the material until it becomes slightly liquid and solidifes again, bonding to the ground.
While we don't always advise installing on block paving, we are able to install. We are experts in surface preparation and use specialist primers and techniques to ensure a strong bond on various surfaces, including tarmac, concrete, and some specialised block paving.
Our markings are designed to last 5 to 10 years, depending on usage and surface type. This lifespan is typically up to 10 times longer than standard outdoor paint, offering a superior long-term return on investment.
Absolutely. Our materials are non-toxic, environmentally safe, and contain anti-slip properties in the surface layer. This ensures they meet all UK safety standards and remain safe even when wet.
Almost immediately. The thermoplastic cools and hardens very quickly after application. Once the installation team has finished clearing the area, the playground is ready for immediate use.
Yes. We offer a comprehensive 3-Year Manufacturer Guarantee on all manufacturing defects. This is a core benefit of choosing a manufacturer, ensuring your investment is protected.
Most standard playground installations are completed within 1 to 2 days. We schedule work to ensure rapid turnaround and minimal disruption to the school schedule.
Thermoplastic requires the surface to be clean and dry. We can install on clear, dry days, even if it is cold. However, we cannot install in persistent rain, snow, or if the surface temperature is below a safe bonding threshold. We monitor weather closely to ensure a successful application.
We advise waiting at least 28 days after a new asphalt surface is laid. This allows the tarmac to fully cure and release volatile oils that could compromise the bond of the thermoplastic. We can advise on your specific site’s timeline - just contact us!
Yes. We operate and install across the entire UK mainland, and can work with you if you require installation outside of the mainland.
Yes, but compliance is essential. The PE & Sport Premium Fund can be used for "revenue maintenance costs" - meaning funds can be used for replacing or repainting existing lines and markings to maintain the asset.
Our model eliminates middleman markups, ensuring better value. Furthermore, our superior durability means less re-marking and maintenance costs, providing the best long-term value for public funds.
Installing markings where none existed is typically classified as Capital Expenditure (creating a new asset) and is generally prohibited under the standard Sport Premium rules. This must usually be funded through grants or fundraising.